Install Day in Washington D.C.

 

 

The install day was October 13th 2013. At 8am that morning a bunch of us students helped put these two pieces in the back of a pick-up truck. Eliot and I rode behind the truck to make sure none of these pieces fell out of the truck for about 2 hours. Some men from one of the Architecture firms met us there at the Park with general contractors as well. When all the men helped put the pieces of the ground, us students started making the final touches to the piece before we sealed it with concrete sealant. We sanded down the edges and wiped down the pieces with water to fully clean them before the sealant was put on. The whole day lasted about 3 to 4 hours long. Some parents were there to help in anyway possible including my mom. The pieces are now permanently installed in the Lederer Park onĀ 4801 Nannie Helen Burroughs Avenue NE Washington DC.

IMG_1799 IMG_1801IMG_1803 IMG_1805 IMG_1807 IMG_1809 IMG_1813 IMG_1815 IMG_1817 IMG_1819 IMG_1821 IMG_1823 IMG_1825 IMG_1829 IMG_1831 IMG_1833 IMG_1835 IMG_1837 IMG_1838 IMG_1840 IMG_1843 IMG_1844 IMG_1847 IMG_1849 IMG_1851 IMG_1852 IMG_1855 IMG_1857 IMG_1858 IMG_1860 IMG_1862 IMG_1864 IMG_1866 IMG_1868 IMG_1870 IMG_1881 IMG_1883 IMG_1886